Consultancy services for detailed Construction Design of Gas Station items for POSCO FUTURE M customer

Project OwnerPV GAS D – NORTH
Year of implementation2026
LocationHung Yen, Vietnam
Investment costConfidential
SoWConstruction design drawings

Upgrade and Expansion of the Dung Quat Refinery

Upgrade and Expansion of the Dung Quat Refinery

Project OwnerBSR
Year of implementation2025
LocationQuang Ngai, Vietnam
Investment cost1.5 billion USD
SoWAppraisal of the FEED Design.

Study on coal–LNG co-firing solutions for power plants in Vietnam

Project OwnerXNNT
Year of implementation2025
LocationVietnam
SoWTechnical study report

LNG suppling for Thu Duc ICE Power plat

Project OwnerXNNT
Year of implementation2025
LocationVietnam
SoWβˆ’ LNG supply solutions

βˆ’ Transportation options


Gas Pipeline System – Nhon Trach 6

ClientXuan Son
Year of implementation2025-2026
LocationDong Nai
Investment costConfidential
SoWEconomic-Technical Report and design construction drawings of the gas supply system.

LNG Supply Station at Saigon LPG Plant

ClientKy Long
Year of implementation2025-2026
LocationNha Be, Ho Chi Minh city
Investment costConfidential
SoWEconomic-Technical Report Explanation and construction design drawings.

Kamhing Plant Gas Supply Station

ClientXNNT
Year of implementation2025
LocationDong Nai
Investment costConfidential
SoWConstruction design drawings and establishment of technical instruction.

TVP Steel Plant CNG Supply Station

ClientGas South
Year of implementation2025-2026
LocationTay Ninh
Investment costConfidential
SoWConstruction design drawings

GLOBAL HANTEX LNG Supply Station

ClientGas South
Year of implementation2025
LocationTay Ninh
Investment costConfidential
SoWConstruction design drawings, Design explanation and Fire safety approval application documents.

Gas Metering & Pressure Reduction System – ECLAT Factory

ClientLNG Solution
Year of implementation2025
LocationHo Chi Minh city
Investment costConfidential
SoWEconomic-Technical Report and construction design drawings.

LNG-CNG Supply Station – XINGFA

ClientGENIE
Year of implementation2026
LocationHai Phong
Investment costConfidential
SoWEconomic-Technical Report Explanation and construction design drawings.

LNG FLAT storage

ClientGENIE
Year of implementation2026
LocationHai Phong
Investment costConfidential
SoWInvestment plan proposal report

LNG Supply Station – FLAT Plant

ClientGENIE
Year of implementation2026
LocationHai Phong
Investment costConfidential
SoWFeasibility Study Report and construction design drawings.

Technical Infrastructure System of My Xuan B1 – CONAC Expanded Industrial Park

ClientAn Hoa Construction
Year of implementation2026
LocationHo Chi Minh city
Investment costConfidential
SoWBasis design

LNG-CNG Supply Station – SUNRISE

ClientNOVA ENERZIA
Year of implementation2026
LocationHung Yen
Investment costConfidential
SoWConstruction design drawings.

Research and Development Consulting

ClientPV GAS D
Year of implementation2026
LocationNationwide
Investment costConfidential
SoWBasis design, technical technology proposal, and technical documentation preparation

TEG System for Dry Gas Recovery

ClientXuan Son
Year of implementation2026
LocationHung Yen
Investment costConfidential
SoWConstruction design drawings.

Pipelines No. 01, 02 and Gas Station for Nhon Trach Industrial Park and Ton Phuong Nam Customer

ClientNhon Trach Enterprise (XNNT)
Year of implementation2026
LocationDong Nai
Investment costConfidential
SoWBasis design drawings, Basis design Explanation and Economic-Technical Report Explanation

Gas Supply System for Customers in Ong Keo Industrial Zone – Dong Nai

ClientNhon Trach Enterprise (XNNT)
Year of implementation2026
LocationDong Nai
Investment costConfidential
SoWInvestment Policy Proposal Report

Main Material Tanks (Ethane) construction work for the Petrochemical complex in South of Vietnam

Main Material Tanks (Ethane) construction work for the Petrochemical complex in South of Vietnam

Project 1: Construction of Ethane tanks for the Southern Petrochemical Complex (LSP): 2×110.000m3 tank.

Project 2: Adjustment work (Olefin plant – A1) for Ethane material

Project OwnerLSP
Year of implementationPJ1-2025, PJ2-2026
LocationBa Ria – Vung Tau, Vietnam
Investment costPJ1-400mil.USD; PJ2-100mil.USD
SoWAppraisal of the Feasibility Study Report & Basic Design, FEED design and Construction permit support.

 


Provision of LNG to Industrial and Transportation Customers

Provision of LNG to Industrial and Transportation Customers

Project OwnerGas South
Year of implementation2020-2022
LocationHo Chi Minh, Binh Duong, Dong Nai, Long An
Investment cost~ 10 mil. USD
SoWFeasibility study, basic design and detailed design & construction drawings.

ITECO Northern LNG Terminal Project

Project OwnerITECO
Year of implementation2018 – 2023
LocationHai Phong
Investment cost~ 144 mil. USD
SoWβˆ’ 2018: Pre-Feasibility Study and Preliminary Design

βˆ’ 2018- 2021: Owner engineer

βˆ’ 2022-2023: Design consultancy and preparation of documents for fire prevention and firefighting approval.

βˆ’ 2022-2023: Market study on gas/LNG utilization


Tan Viet LNG Gas Supply Station

Tan Viet LNG Gas Supply Station

Project OwnerTAN VIET METAL SCIENCE AND TECHNOLOGY COMPANY LIMITED
Year of implementation2024
LocationNghe An
Investment cost~ 1 mil. USD
SoWβˆ’ Detailed Design

βˆ’ Fire Prevention and Firefighting (FPF) Design

βˆ’ Preparation of the Total Investment Cost


Nha Trang LPG Filling Station

Nha Trang LPG Filling Station

Project OwnerGas South
Year of implementation2022
LocationNha Trang city, Khanh Hoa province
Investment cost~ 2 mil. USD
SoWDetailed engineering and cost estimate

Gas Pipeline

Gas Pipeline PVGAS D

Gas Pipeline for upgrading of gas supply capacity at Nhon Trach Industrial Park and Low-pressure gas supply system for Phuong Nam Roof Sheet Plant

Project OwnerPVGas D
Year of implementation2022
LocationNhon Trach district, Dong Nai province
Investment cost~ 1.3 mil. USD
SoWFS and basic design

Gas supply system and Gas Receiving Station

Gas supply system and Gas Receiving Station

Gas supply system for My Xuan B1 Industrial zone and Gas receiving station for Global Vietnam Aluminum plant Phase 1 & Phase 2 and phase 3 (supply gas to Nam Kim factory)

Project OwnerGASTECH
Year of implementation2019-2020; 2025-2026
LocationPhu My district, Ba Ria – Vung Tau
Investment cost>5 mil. USD
SoWTechno-economic report and detailed design, Owner Engineer, EPC and authority approvals.

Nam Kim Gas Pipeline

Project OwnerGASTECH
Year of implementation2024-2025
LocationVΕ©ng TΓ u
Investment cost~ 2 mil. USD
SoWTechno-economic report and detailed design Firefighting prevention