Online Partial Discharge Monitoring System for 33kV HV Equipment & Underground Cables – Nghi Son Refinery
| Client | 247 Construction Material |
| Year of implementation | 2026 |
| Location | Thanh Hoa |
| Investment cost | Confidential |
| SoW | Construction design drawings. |
PFD & P&ID Restoration and Standardization – VILUBE Plant
| Client | VILUBE |
| Year of implementation | 2026 |
| Location | Ho Chi Minh city |
| Investment cost | Confidential |
| SoW | Technical Proposal |
Modification of MV Cable Joint Location for Main Cable Routes Project at NSRP
| Client | Chan Hung |
| Year of implementation | 2026 |
| Location | Thanh Hoa |
| Investment cost | Confidential |
| SoW | Construction design drawings. |
Equipment Inspection for Gas Station
| Client | Gastech |
| Year of implementation | 2022-2023 |
| Location | Ba Ria-Vung Tau |
| Investment cost | confidential |
| SoW | Equipment inspection for gas pipeline; Equipment inspection for field instrumentation |
F&G and Instrumentation Equipment Supply
| Client | Thang Long, SIGMA, Gastech |
| Year of implementation | 2022-2023 |
| Location | confidential |
| Investment cost | confidential |
| SoW | Gas detectors; Flow Computer; Ins cable; instrumentation equipments |