PVOil

Replacement of underground pipeline crossing Dinh river connecting Cu Lao Tao oil terminal and Thang Nhat oil terminal.

Project OwnerPVOil
Year of implementation2023
LocationVung Tau
Investment cost~ 4.5 mil. USD
SoW
  • Consulting on investment policy application documents
  • Pre-feasibility study reports

Ba Ngoi Petroleum Terminal

Project OwnerPVOil
Year of implementation2023
LocationCam Ranh, Khanh Hoa
Investment cost~ 5.9 mil. USD
SoW
  • Feasibility Study and Basic Design
  • Preparation of documents for Fire Prevention and Fighting approval

PVOil

Upgrading pump capacity and renovating the process pipeline of the export pump house area at ​​NSRP

Project OwnerPVOil
Year of implementation2023
LocationThanh Hoa
Investment cost~ 3 mil. USD
SoW
  • Basic design and engineering design
  • Preparation of fire protection design documents
  • Hydraulic calculations and preparation of surge pressure analysis reports

PETIMEX

Expansion of Phuoc Khanh Petroleum Terminal

Project OwnerPETIMEX
Year of implementation2022
LocationDong Nai
Investment cost~ 16.5 mil. USD
SoW
  • Feasibility study report and basic design
  • Surveying current status and preparing master plan 1/500