PVOil
Replacement of underground pipeline crossing Dinh river connecting Cu Lao Tao oil terminal and Thang Nhat oil terminal.
| Project Owner | PVOil |
| Year of implementation | 2023 |
| Location | Vung Tau |
| Investment cost | ~ 4.5 mil. USD |
| SoW | - Consulting on investment policy application documents
- Pre-feasibility study reports
|
Ba Ngoi Petroleum Terminal
| Project Owner | PVOil |
| Year of implementation | 2023 |
| Location | Cam Ranh, Khanh Hoa |
| Investment cost | ~ 5.9 mil. USD |
| SoW | - Feasibility Study and Basic Design
- Preparation of documents for Fire Prevention and Fighting approval
|
PVOil
Upgrading pump capacity and renovating the process pipeline of the export pump house area at NSRP
| Project Owner | PVOil |
| Year of implementation | 2023 |
| Location | Thanh Hoa |
| Investment cost | ~ 3 mil. USD |
| SoW | - Basic design and engineering design
- Preparation of fire protection design documents
- Hydraulic calculations and preparation of surge pressure analysis reports
|
PETIMEX
Expansion of Phuoc Khanh Petroleum Terminal
| Project Owner | PETIMEX |
| Year of implementation | 2022 |
| Location | Dong Nai |
| Investment cost | ~ 16.5 mil. USD |
| SoW | - Feasibility study report and basic design
- Surveying current status and preparing master plan 1/500
|