Chemical Storage Tanks at Go Dau
| Project Owner | ORO VINA |
| Year of implementation | 2022 |
| Location | Dong Nai |
| Investment cost | ~ 10 mil. USD |
| SoW |
|
Detailed Engineering for Cryogenic Liquified Hydrocarbon Storage Tanks
| Project Owner | BGE Energy Joint Stock Corporation |
| Year of implementation | 2023 |
| Location | Vung Tau |
| Investment cost | ~ 4 mil. USD |
| SoW | Detail Engineering of Chemical storage tanks for cryogenic liquified hydrocarbon |
Plant of Recycle of PET Scrap Fabric into Plastic Granules
| Project Owner | PVChem Tech |
| Year of implementation | 2023 |
| Location | confidential |
| Investment cost | confidential |
| SoW | Conceptual design |
Phu My 3 Specialized Industrial Park
| Project Owner | BGE Energy Joint Stock Corporation |
| Year of implementation | 2023 |
| Location | Phu My district, Ba Ria – Vung Tau |
| Investment cost | confidential |
| SoW | Market Study; Feasibility study |

